里程碑与预算表(官方五类 + CSV)

里程碑与预算表(官方五类 + CSV)

status draft2026-11-04liangrui99SPIN@HSITP · 里程碑与预算表(提交面 · 表单粘贴文本 · 12 个月两期 · 二元验收)
本页目录(8)
  1. 0. Header block(表单抬头若要求一句话,用这段)
  2. 1. Twelve-month milestone plan (binary acceptance)
  3. 2. Success metrics (target values, all labelled target; one frozen task set, one methodology)
  4. 3. Budget of HK$150,000
  5. 4. Deliverables handed to the programme
  6. 5. Assumptions and risks stated on the form
  7. 6. CSV import block(官方逐字允许 "export the CSV and import it")
  8. 7. 繁體中文對照(內部核對件 · 不上傳 · 語義以英文正文為準)

里程碑与预算表 · 提交版(英文)

内部说明(本段不提交):官方报名流程逐字要求「網上填寫申請表格,包括項目里程碑」。门户 Guide 对里程碑栏的三条硬要求已逐字核实(internal/04 §1 Q2):① milestone target must be quantifiable and aligned with the SMART criteria;② You can input your milestone in the table or export the CSV and import it;③ 官方给出五类参考分类——Corporate Development / Product and Technology Development / Business Development / Financial / Others ⇒ 本表逐行归入这五类(Category 列),并在 §6 备好 CSV 块。 实表列名(是否含 Start date / Target date / Category)登录后按 操作指引 §3 C3 核对,CSV 表头须与实表逐字一致才可导入。 同源底稿 = internal/02 §4/§5;金额与判据改动必须两处同批。 文末 §7 为繁體中文對照,仅供内部核对,不上传、不粘贴进表单。

0. Header block(表单抬头若要求一句话,用这段)

Project: Duty Runtime: Contained LLM Task Closure with Cross-Tenant Isolation Guarantees (+ open benchmark ChunYue-Agent-Bench). Domain: Artificial Intelligence and Data Science. Duration: 12 months. Grant requested: HK$150,000, in two equal instalments of HK$75,000 released on the six-monthly milestone reviews. Applicant: team application; a private limited company under the Companies Ordinance (Cap. 622) will be incorporated within two weeks of the admission date.

1. Twelve-month milestone plan (binary acceptance)

MonthCategory (official five)Milestone IDActivityBinary acceptance criterion (achieved / not achieved)Evidence produced
M1Product and Technology DevelopmentA1Re-measure the completion baseline on the frozen task set, same methodology as the 45% internal production measurementA second person, given the frozen inputs and scripts, reproduces the same numberRe-measurement report: sample size, task types, model version, tool permissions, raw logs
M2Product and Technology DevelopmentA2Freeze task set v1: ≥120 tasks covering both in-scope duties and out-of-scope requests, with schema and scorerTask set and scorer committed, executable, full run completedtaskset-v1 + scorer + schema documentation
M3Product and Technology DevelopmentA3Content-layering contract v1: typed actions carrying preconditions, risk level, permitted phrasingsContract covers every action type in the pilot; spot-checked out-of-scope samples generate escalation obligations only, no AI actionsContract v1 + sampled audit extract
M4Product and Technology DevelopmentA4Silent-escalation orchestration v1: named owner, deadline, takeover context summary, same service identity continuedEvery escalation traceable end to end: obligation record → takeover → final resolutionOrchestration module + escalation obligation records
M5Product and Technology DevelopmentA5Adversarial probe suite v0 (≥25 probes: prompt injection, tool over-privileging, context backfilling)Suite executable and 2 falsification experiments (deliberately open one leg) turn it red on the spotProbe suite + falsification log
M6Business DevelopmentA6Pilot #1 live (related-party operation permitted at this stage); PDPO notice and session logging in production configuration30 consecutive days of real session logs stored and sampleablePilot configuration + 30-day log extract + PDPO notice screenshots
M6 gateFinancial—Mid-term milestone review — release of the second HK$75,000A1–A6 all achieved, plus financial statement reflecting fund movementMid-term report + statement
M7Product and Technology DevelopmentB1aRun the metric family on the frozen set: actual completion, closure, unreasonable escalation, false promisesEach metric reported with value, sample size and raw-log location; unmet items reported as unmet with cause analysisEvaluation run logs
M8Product and Technology DevelopmentB2Probe suite v1: ≥50 probes, plus masked-table coverage assertion against the reconciled scope definitionSuite reports 0 leakage events; coverage assertion passes at 100% on the reconciled figure; falsification leg still fails closedCoverage report + suite output
M9OthersB3Release ChunYue-Agent-Bench: 500 tasks × 3 baseline models, Apache-2.0, with scorer and methodologyRepository publicly reachable; licence and README complete; replication instructions runnable as writtenPublic benchmark repository
M10Product and Technology DevelopmentB4Replication experiment: second operator, second machineByte-identical results on the same inputs and scorer; otherwise reported as not achievedReplication log (two environments)
M11Business DevelopmentB5Unrelated commercial pilot: ≥1 paying operator onboarded; first-response latency measured before/afterContract or invoice plus logs; latency claim only with ≥30 samples on each side; if no pilot signed, reported as not obtained with live pipeline listedContract/invoice + latency dataset
M12Corporate DevelopmentB6IGNITE-readiness: 2 Hong Kong-based full-time R&D employees engaged, cap table as committed, park move-in plan scheduledEmployment contracts + shareholding table + move-in plan, all presentHR and corporate records
M12 gateFinancial—Final milestone reviewB1–B6 reported honestly; technical report covering D1–D5 methods and conclusions deliveredFinal technical report + benchmark link + statement of accounts + log locations

2. Success metrics (target values, all labelled target; one frozen task set, one methodology)

MetricBaselineM12 targetDefinition used to prevent gaming
Actual completion rate45% (measured, internal production, 2026-09)≥70%Task closed by the system without human intervention and the action verifiably persisted in the backend with a receipt
Closure rate—≥95%Completed plus legitimately escalated, with escalated items 100% taken over and ultimately resolved (completion separated from escalation, so "escalate everything" cannot score)
Unreasonable escalation rate—≤5%In-scope duties that the system should have completed but pushed to a human
False-promise rate—<0.5%A reply promising an action that never occurred, checked line by line against backend logs
Cross-tenant leakage—0Any appearance of another organisation's data in a response or context, in the probe suite or in real session audits
Human gate on money and contract actions100% (existing architecture)100%Such actions are never completed by the AI
First-response latency—−30%Median minutes from request to first substantive action; resolution time reported separately and never merged

3. Budget of HK$150,000

LineHK$Instalment 1 (M1–M6)Instalment 2 (M7–M12)Milestones funded
R&D engineering hours in Hong Kong78,00039,00039,000A1–A5, B1–B4
Model API and compute24,0008,00016,000A2, A5, B1, B3 (500 × 3 evaluation runs; no fine-tuning)
Evaluation corpus and annotation18,00012,0006,000A2, B3
Legal and PDPO advisory12,0006,0006,000A3, A6, B2
Open-source benchmark and documentation10,0002,0008,000B3, B4
Park move-in and review-panel travel8,0002,0006,000B6, panel interview
Total150,00075,00075,000

[TO FILL — requirement: if the portal asks for budget by category from a fixed dropdown, map the six lines above to the closest official categories and record the mapping here so the BP §8 table and the form never diverge — evidence: screenshot of the filled form — owner: 代理]

Manpower line, stated plainly so it cannot be misread: HK$78,000 ÷ 12 months = HK$6,500 per month, a partial subsidy of in-Hong-Kong engineering hours. We do not claim that HK$150,000 funds two full-time salaries; full-time employment from M11 onward is carried by the company's own resources.

4. Deliverables handed to the programme

Mid-term (M6): re-measurement report · frozen task set v1 + scorer · layering contract v1 · escalation orchestration v1 · probe suite v0 with falsification log · pilot #1 configuration and 30-day logs · statement of accounts.

Final (M12): technical report (D1–D5 methods and conclusions, including unmet targets reported as unmet) · metric-family results with raw-log locations · probe suite v1 and coverage report · public ChunYue-Agent-Bench repository · replication log · pilot contract or invoice plus latency dataset · employment and corporate records for the next stage.

5. Assumptions and risks stated on the form

RiskEffect if it landsMitigation already in the plan
The 45% → ≥70% hypothesis is wrong (architecture does not lift completion)B1 reported as unmetThe frozen task set, scorer and released benchmark remain usable by third parties; the negative result is itself a publishable artefact
Model vendor changes pricing or deprecates a baseline model mid-projectEvaluation runs and cost line shiftThree baseline models are specified, not one; suite runs are reproducible offline on recorded outputs
No unrelated pilot signs within the window (HK$0 revenue today)B5 unmet, commercial section weaker at IGNITE stagePilot #1 (related-party) still produces the 30-day log evidence; outreach list and letter template prepared; B5 reported honestly if unmet
Tenant-scope coverage definition not reconciledD3 coverage claim cannot be quantifiedReconciliation is a blocking step of the pre-submission nine-step review (internal/01 H8); until resolved, no table count is quoted in any submission text
Team has not yet incorporatedCannot sign the programme agreementTeam route exists precisely for this; incorporation inside two weeks of admission, with the IGNITE-compliant shareholding fixed at that moment

6. CSV import block(官方逐字允许 "export the CSV and import it")

⚠️ 表头须与门户实表列名逐字一致才导入得进(操作指引 §3 C3 回填后再定稿;下表按 Guide 的分区语义先行给出,列名一变即改此处,不得凭记忆上传)。字段内不含逗号以外的分隔符;含逗号的句子已整体加引号。

csv
Month,Category,Milestone,Quantified target,Acceptance (achieved / not achieved),Evidence
M1,Product and Technology Development,"A1 Baseline re-measurement on frozen task set","Reproduce 45% internal production baseline; report 1 sample set","Second person with frozen inputs and scripts reproduces the same number","Re-measurement report (sample size, task types, model version, tool permissions, raw logs)"
M2,Product and Technology Development,"A2 Frozen task set v1","120+ tasks, 2 classes (in-scope / out-of-scope), 1 scorer","Task set and scorer committed, executable, full run completed","taskset-v1 + scorer + schema"
M3,Product and Technology Development,"A3 Content-layering contract v1","100% of pilot action types typed with preconditions, risk level, permitted phrasings","Out-of-scope samples generate escalation obligations only, no AI actions","Contract v1 + sampled audit extract"
M4,Product and Technology Development,"A4 Silent-escalation orchestration v1","100% of escalations carry named owner + deadline + context summary","Obligation record to takeover to final resolution traceable end to end","Orchestration module + escalation records"
M5,Product and Technology Development,"A5 Adversarial probe suite v0","25+ probes over 3 attack classes","Suite executable and 2 falsification experiments turn it red on the spot","Probe suite + falsification log"
M6,Business Development,"A6 Pilot #1 live (related-party)","30 consecutive days of real session logs","Logs stored and sampleable; PDPO notice in production configuration","Pilot configuration + 30-day log extract + PDPO notice"
M6,Financial,"Mid-term milestone review (second instalment HK$75,000)","6 of 6 Phase A milestones achieved","A1-A6 all achieved plus statement of accounts reflecting fund movement","Mid-term report + statement"
M7,Product and Technology Development,"B1 Metric family run on frozen set","4 metrics reported with values and sample sizes","Each metric reported with value, sample size, log location; unmet items reported as unmet","Evaluation run logs"
M8,Product and Technology Development,"B2 Probe suite v1","50+ probes, 0 leakage events, coverage assertion 100% on reconciled scope","Suite reports zero leakage; falsification leg still fails closed","Coverage report + suite output"
M9,Others,"B3 ChunYue-Agent-Bench public release","500 tasks x 3 baseline models, Apache-2.0","Repository publicly reachable, licence and README complete, replication instructions runnable","Public benchmark repository"
M10,Product and Technology Development,"B4 Replication experiment","2 environments, 2 operators, identical results","Byte-identical results or reported as not achieved","Replication log"
M11,Business Development,"B5 Unrelated paying pilot","1+ contracted operator; 30+ samples per side for latency","Contract or invoice plus logs; if none signed, reported as not obtained","Contract/invoice + latency dataset"
M12,Corporate Development,"B6 IGNITE readiness","2 Hong Kong full-time R&D employees; founders 51%+ direct shareholding","Employment contracts + shareholding table + move-in plan present","HR and corporate records"
M12,Financial,"Final milestone review","All Phase B items reported honestly","Technical report covering D1-D5 delivered with unmet items labelled unmet","Final report + benchmark link + statement of accounts"

SMART 自查(官方逐字要求 quantifiable + SMART):每行都有数字(120+/25+/50+/30 天/1 家/51%/6 of 6)+时点(M1–M12)+二元判据(达成/未达成,无「部分成功」)+可指认证据(最后一列)。⇒ 若实表另有 Target date 栏,按「录取日 + M(n)」换算成日期填写,不得写成相对月数了事。

7. 繁體中文對照(內部核對件 · 不上傳 · 語義以英文正文為準)

§0 抬頭:項目=Duty Runtime:受約束 LLM 任務閉環的完成判定、靜默升級與跨租戶洩漏防控(附公開基準 ChunYue-Agent-Bench)。領域=人工智能與數據科學。年期=12 個月。申請補助=港幣 150,000 元,按每 6 個月里程碑評估分兩期等額發放(各 75,000 元)。申請身份=團隊申請;獲錄取起兩星期內根據《公司條例》(第 622 章)註冊香港私人股份有限公司。

§1 十二個月里程碑(逐行對應上表,Category 為官方五類)

月分類(官方五類)里程碑二元驗收判據
M1產品與技術開發A1 以同方法學在凍結任務集上復測基線(內部生產實測為 45%)第二人取凍結輸入與腳本跑出同一數 ⇒ 達成
M2產品與技術開發A2 凍結任務集 v1:≥120 例,含清單內與越界兩類,附 schema 與評分器入庫、可執行、全量跑通 ⇒ 達成
M3產品與技術開發A3 內容分層契約 v1:類型化動作+前置條件+風險等級+允許話術契約覆蓋試點全部動作類型;抽檢的越界樣本只產生升級義務、不產生 AI 動作 ⇒ 達成
M4產品與技術開發A4 靜默升級編排 v1:具名責任人+期限+接管上下文摘要,同一服務身份接續升級件端到端可追溯(義務記錄 → 接管 → 最終解決) ⇒ 達成
M5產品與技術開發A5 對抗探針套件 v0:≥25 探針(提示注入/越權工具調用/上下文回填)套件可執行,且 2 例反證實驗(故意放開一條腿)當場報紅 ⇒ 達成
M6業務發展A6 試點 #1 上線(本階段允許關聯自營),PDPO 告知與會話日誌落地連續 30 天真實會話日誌入庫且可抽樣展示 ⇒ 達成
M6 閘財務期中里程碑評估——發放第二期港幣 75,000 元A1–A6 全部達成 + 反映資金流轉的財務報表
M7產品與技術開發B1 在凍結集上跑指標族:實際完成/閉環/不合理升級/虛假承諾每項給實測值+樣本量+日誌位置;未達成項如實報未達成並給原因
M8產品與技術開發B2 探針套件 v1:≥50 探針 + 遮蔽表覆蓋斷言(以已核對口徑的作用域定義為準)洩漏 0 件;覆蓋按對口徑後的數 100%;反證腿仍必須失敗即封閉
M9其他B3 釋出 ChunYue-Agent-Bench:500 例 × 3 基線模型,Apache-2.0,附評分器與方法學倉庫公開可達、許可證與 README 完整、複現指引照文可跑
M10產品與技術開發B4 複現實驗:第二操作者、第二台機器同輸入同評分器跑出逐字節一致;不一致即如實報未達成
M11業務發展B5 非關聯付費試點 ≥1 家簽約;首響時延前後對比合約或發票 + 日誌雙證;每側 ≥30 例方可宣稱時延改善;未取得則報「未取得」並附在談清單
M12公司發展B6 升讀 IGNITE 準備:2 名在港全職研發、股權按承諾落位、進駐計劃排定僱傭合約 + 股權結構表 + 進駐計劃三件齊 ⇒ 達成
M12 閘財務結項里程碑評估B1–B6 如實申報;技術報告覆蓋 D1–D5 方法與結論

§2 指標族(全部標 target,同一凍結任務集、同一方法學):實際完成率 基線 45%(2026-09 內部生產實測)→ ≥70%;閉環率 ≥95%(完成+合理升級,且升級件 100% 被接管並最終解決——拆開計分,防「全升級」刷分);不合理升級率 ≤5%;虛假承諾率 <0.5%(與後端日誌逐條比對);跨租戶洩漏 0;錢與合同人工閘門 基線 100% → 100%(此類動作永不由 AI 完成);首響時延 −30%(請求→首個實質動作的中位分鐘數;解決時長另行報告,不與首響混用;前後各 ≥30 例方可宣稱)。

§3 預算港幣 150,000 元(分科目綁里程碑):在港研發工時 78,000(39,000/39,000)|模型 API 與算力 24,000(8,000/16,000)|評測語料與標注 18,000(12,000/6,000)|法務與 PDPO 顧問 12,000(6,000/6,000)|開源基準與文檔 10,000(2,000/8,000)|園區進駐與評審差旅 8,000(2,000/6,000)⇒ 兩期各 75,000。人力行大白話口徑:78,000 ÷ 12 = 6,500/月,是在港工程工時的部分補貼;我方不聲稱15 萬養 2 名全職,M11 起的全職成本由公司自有資源承擔。

§4 交付件:期中(M6)=復測報告 · 凍結任務集 v1+評分器 · 分層契約 v1 · 升級編排 v1 · 探針套件 v0+反證日誌 · 試點配置與 30 天日誌 · 財務報表。結項(M12)=技術報告(D1–D5,未達成項照實寫)· 指標族結果與原始日誌位置 · 探針套件 v1 與覆蓋報告 · 公開基準倉庫 · 複現日誌 · 試點合約/發票與時延數據 · 下一階段所需的受僱與公司記錄。

§5 假設與風險:① 45%→≥70% 的假設若落空 ⇒ B1 報未達成,但凍結集、評分器與公開基準對第三方仍可用,負面結果本身即是可發表的產出;② 模型供應商改價或下架基線模型 ⇒ 已指定 3 個基線模型而非 1 個,且套件可在已錄輸出的結果上離線重跑;③ 窗口內無非關聯試點簽約(今日收入 HK$0)⇒ B5 報未達成,關聯自營試點仍產出 30 天日誌,外聯名單與承諾函模板已備;④ 跨租戶作用域口徑未對 ⇒ D3 的覆蓋主張無法量化,故在對齊前任何提交面都不出現表數;⑤ 主體未註冊 ⇒ 團隊通道正為此而設,錄取起兩週內註冊,並在一次註冊時把符合 IGNITE 口徑的股權落定。